10 MW Solar PV Power Project by Azure Power
#118of 1935 in Renewable energy#55of 975 in India#66of 1459 in CDM (UNFCCC)#41of 806 in AMS-I.D
Audit Analysis
A 10 MW solar PV project in India under CDM with a VVB-verified combined additionality test, jurisdictional baseline, and a reasonable 0% leakage deduction. The project is an avoidance-type with minimal permanence risk, though transparency is limited by the absence of a verified ERR figure and unspecified CORSIA/CCP status. Documentation is solid with all 14 CARs and 10 CLs closed, but the grid emission factor dates to 2011 and several key parameters remain unreported.
Red Flags
- Verified ERR figure not found in the extracted record; only the claimed 124,043 tCO₂e is available, limiting independent cross-checking
- Grid emission factor of 0.949 tCO₂/MWh is from 2011; no evidence of periodic grid EF updates or sensitivity analysis for a project crediting through 2022
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, deemed negligible (appropriate for solar PV)
Jurisdictional baseline, grid EF 0.949 (2011)
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →