10 MW Wind Power Project In Maharashtra By Deepak Fertilizers And Petrochemicals Corporation Limited
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test
missing Leakage is not consistently treated (later monitoring report says not addressed; no leakage deduction found), and baseline reassessment timing is not stated
Transparency
verified VVB is identified (LGAI Technological Center, S.A. / Applus+ Certification) and both claimed and verified ER totals are present in the extracted record
missing Key MRV figures are contradictory across versions (ER totals, grid emission factor, crediting period), reducing transparency and auditability
Claim Safety
verified The project is stated as not CORSIA-eligible, reducing dual-claim channel risk
missing Over-crediting risk is elevated by contradictory ER totals and grid emission factor values across validation report versions
Documentation
verified Multiple document types were available (monitoring report, validation report, PDD) with high extraction confidence and 13 documents used
missing Project record shows internal inconsistencies (including even the crediting period), which undermines document reliability despite availability
Detailed Analysis
Integrity
The validation/verification record indicates additionality was confirmed by the VVB using an investment test. The baseline is project-specific (project baseline), and the timing of any baseline reassessment is not stated in the extracted record. Leakage is a key weakness: the later monitoring report (2021-07-01) says leakage was not addressed, while an earlier monitoring report (2010-01-29) indicates leakage was quantified, and no leakage deduction percentage is found.
Transparency
The extracted record identifies the VVB (LGAI Technological Center, S.A. / Applus+ Certification) and provides a monitoring period (2013-01-01 to 2019-10-06). However, transparency is reduced by major inconsistencies across document versions on core accounting inputs/outputs, including total ERs and the grid emission factor. While the extracted record shows no material findings and no corrective actions, the contradictions make it harder to independently reconcile what was actually validated/verified.
Claim Safety
The project is explicitly marked as not CORSIA-eligible, which lowers the risk of claims being used simultaneously in CORSIA-related contexts. Nonetheless, over-crediting/claims risk remains because different validation report versions disagree on total ERs (281,345 vs 64,883) and the grid emission factor (0.62286 vs 0.82), both of which can materially change credited volumes. CCP status is not stated in the extracted record, leaving uncertainty about alignment with higher-integrity claim frameworks.
Documentation
Documentation coverage is relatively strong: the extracted record includes a monitoring report, validation report, and PDD, with 13 documents used and high extraction confidence. The record also indicates no material findings and no corrective actions required. However, the presence of multiple contradictions across documents (including crediting period and key quantification parameters) suggests version control and record consistency issues that reduce documentation quality.
Overall
Overall scoring is pulled down primarily by internal inconsistencies across official documents and unclear leakage treatment. For the ER totals and grid emission factor contradictions, the more recent validation report version (2021-07-06) is privileged over the earlier version (2021-05-08) because it is later-dated and likely reflects an updated/issued version; however, the existence of two conflicting values still indicates reliability risk and reduces scores. For leakage and safeguards/grievance contradictions, the later monitoring report (2021-07-01) is privileged as the more recent operational record, but the shift from “quantified” to “not addressed” (and from safeguards/grievance absent to present) signals inconsistent reporting that warrants conservative scoring.
Audit Analysis
This is a grid-connected renewable electricity project with additionality confirmed by the VVB and no reported material findings or corrective actions in the extracted record. However, multiple internal document contradictions (ERR totals, grid emission factor, and crediting period) and weak/unclear leakage treatment reduce confidence in the robustness of credited outcomes.
Project Description
Deepak Fertilisers and Petrochemical Corporation Ltd. proposed a 10 MW wind power project in Maharashtra. The project includes eight wind electricity generators, each with a capacity of 1.25 MW.
Red Flags
- Major inconsistencies across documents on verified/claimed ERs (281,345 vs 64,883) and grid emission factor (0.62286 vs 0.82), indicating data reliability risk
- Leakage treatment is inconsistent across monitoring reports (earlier report says quantified; later report says not addressed), with no clear leakage deduction stated
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 24,151 | 2,048 | 22,103 | |
| 2012 | 12,258 | 12,258 | 0 | |
| 2013 | 11,861 | 11,861 | 0 | |
| 2014 | 13,234 | 13,234 | 0 | |
| 2015 | 11,622 | 11,622 | 0 | |
| 2016 | 13,067 | 10,617 | 2,450 | |
| 2017 | 2,841 | 2,841 | 0 | |
| Total | 89,034 | 64,481 | 24,553 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled, version-controlled quantification package that explains changes between validation report versions (ER totals, grid emission factor, and crediting period) and clearly identifies the final values used for issuance
- Provide a clear leakage assessment consistent across monitoring reports, including whether leakage is applicable, the justification, and any deduction applied (even if 0%)
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal events reported
Leakage inconsistently addressed
Project-specific baseline; reassessment timing unclear
Safeguards/grievance inconsistently documented; no FPIC
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →