100.5 MW Wind Power Project in Madhya Pradesh, India
GS-686 ↗ · current registry ID: GS3969
#807of 1935 in Renewable energy#404of 975 in India#483of 1801 in Gold Standard (GS)#631of 1287 in ACM0002
Audit Analysis
A 100.5 MW wind project in Madhya Pradesh with VVB-confirmed investment additionality and low inherent reversal risk, but undermined by multiple unresolved corrective actions, a significant discrepancy between the ex-ante and verified emission reduction figures (212% of pro-rata expectation), a project-specific baseline, and no stated buffer pool. The project's safeguards framework (FPIC, grievance mechanism) is present, and CORSIA ineligibility is confirmed, but the volume of open findings and internal contradictions in key parameters erode confidence in the robustness of the credit claims.
Red Flags
- Verified ERR of 356,627 tCO2e is approximately 212% of the PDD ex-ante estimate of 167,934 tCO2e for the comparable period, raising questions about the accuracy of either the baseline calculation or the monitoring data
- Multiple corrective actions (CAR #1 through #7) and a compliance log item (CL 01) remain open or inconsistently closed across verification reports, including unresolved issues with SD parameter reporting, methodology version consistency, and ER sheet alignment
- Crediting period start date is contradictory: the 2024 verification report states 2015-01-01 while the 2023 monitoring report states 2022-01-01, a seven-year discrepancy that affects the pro-rata baseline calculation
- Baseline method is contradictory: the 2024 verification report describes a project-specific baseline while the 2023 monitoring report references a jurisdictional baseline
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 181,724 | 181,724 | 0 | |
| 2016 | 189,578 | 189,578 | 0 | |
| 2017 | 189,545 | 180,477 | 9,068 | |
| 2018 | 195,299 | 195,243 | 56 | |
| 2019 | 180,200 | 179,064 | 1,136 | |
| 2020 | 171,066 | 148,357 | 22,709 | |
| 2021 | 186,735 | 0 | 186,735 | |
| 2022 | 169,892 | 0 | 169,892 | |
| Total | 1,464,039 | 1,074,443 | 389,596 |
Risk Indicators
VVB-confirmed investment test
low inherent risk (wind)
0% deduction, reasonable for wind
Project-specific; method contradictory across docs
FPIC, grievance mechanism, benefit sharing documented
CORSIA not eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →