100.8 MW Wind Power Project in Beluguppa, Andhra Pradesh
GS-982 ↗ · current registry ID: GS5614
#19of 1935 in Renewable energy#11of 975 in India#3of 1801 in Gold Standard (GS)#10of 1287 in ACM0002
Audit Analysis
A 100.8 MW wind power project in Andhra Pradesh, India, registered under Gold Standard with a VVB-confirmed investment additionality test and a project-specific baseline using a 2022 grid emission factor of 0.9777. The project delivered 24% less than its PDD estimate for the 2024 monitoring period, which is conservative and reduces over-crediting risk. Documentation is adequate but carries numerous administrative corrective actions and a medium extraction confidence level.
Red Flags
- Actual emission reductions are approximately 24% lower than estimated in the PDD, indicating baseline estimation uncertainty
- FPIC status is contradictory: the 2024 verification report states it was not conducted, while the 2019 monitoring report states it was conducted
- CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel allocation ambiguity
- Multiple administrative corrective actions (format, geo-coordinates, links, SDG impact consistency) required in the 2024 verification report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 36,832 | 36,832 | 0 | |
| 2017 | 203,680 | 202,619 | 1,061 | |
| 2018 | 224,542 | 183,850 | 40,692 | |
| 2019 | 191,343 | 191,343 | 0 | |
| 2020 | 156,539 | 154,046 | 2,493 | |
| 2021 | 160,207 | 0 | 160,207 | |
| 2022 | 195,421 | 0 | 195,421 | |
| Total | 1,168,564 | 768,690 | 399,874 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, quantified justification
Project-specific, 24% under-delivery vs PDD
Grievance mechanism present, FPIC contradictory
CORSIA eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →