100 MW Wind Power Project by RS India Wind Energy Pvt. Ltd. at Matrewadi & Varekrwadi, Satara district in Maharashtra
#36of 1935 in Renewable energy#22of 975 in India#23of 1459 in CDM (UNFCCC)#24of 1287 in ACM0002
Audit Analysis
A 100 MW onshore wind project in Maharashtra, India, registered under CDM with a jurisdictional grid baseline and a combined additionality test confirmed by SGS United Kingdom. The project presents a standard, low-risk renewable energy credit profile with no reversal events and a reasonable 0% leakage deduction, though the absence of a VVB-verified ERR figure and several unstated eligibility fields (CORSIA, CCP) limit full confidence in the claimed 471,913 tCO₂e.
Red Flags
- Total ERR verified by the VVB is not found in the extracted record; only the claimed figure of 471,913 tCO₂e (2022 monitoring report) is available, preventing independent confirmation of the credit volume.
- Eleven material findings (CARs and CLs) were raised during validation, including missing DNA approval letter, incomplete baseline scenario details, and an additionality analysis lacking a clear benchmark and sensitivity analysis — all subsequently resolved, but they indicate initial documentation weaknesses.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 4,539 | 0 | 4,539 | |
| Total | 4,539 | 0 | 4,539 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deemed negligible, reasonable for wind
Jurisdictional grid EF, no reassessment date found
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →