10MW Waste Heat Recovery based Captive Power Project at Vikash Metal and Power Limited
#864of 1329 in Industrial#753of 975 in India#1129of 1459 in CDM (UNFCCC)#23of 28 in ACM0004
Audit Analysis
A 2007 CDM waste-heat-recovery captive power project in India with VVB-confirmed additionality (combined test by SGS UK) and a standard ACM0004 methodology, but hampered by three inter-document contradictions (ERR basis, baseline method, leakage justification), a 0% leakage deduction with only a 'deemed negligible' rationale, and very limited post-validation monitoring or verification data. The project is an energy-efficiency type with inherently low permanence risk, yet the data gaps and low extraction confidence prevent a higher confidence assessment.
Red Flags
- Three contradictions across documents: ERR figure (385,917 in PDD vs ~55,132 in appendix), baseline method ('project' in validation report vs 'jurisdictional' in PDD), and leakage justification ('deemed negligible' in validation report vs 'quantified' in appendix)
- No verified emissions reduction data found in any available document; total ERR verified is absent from the extracted record
- Eleven material findings raised at validation (missing approval letter, unclear project boundary, missing calculation sheets, unclear additionality discussion, missing stakeholder consultation proof, etc.), all subsequently closed but indicating a weak initial submission
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and data completeness cannot be fully confirmed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
EE project, no reversal risk
0% deduction, contradictory justification
Project-specific, method contradiction
Mentioned but details absent
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →