Skip to main content
UCRBhavnagar Bharuch Porbandar Districts in GujaratACM0002

123.88 MW Bundled Wind, Solar and Hybrid Power Project by KP Group in Gujarat

UCR-487 ↗

#11of 433 in Universal Carbon Registry (UCR)#1151of 1287 in ACM0002

4.2/ 10
Integrity
4.8
Transparency
3.2
Claim Safety
4.8
Documentation
3.2

Audit Analysis

A 123.88 MW bundled wind, solar, and hybrid power project in Gujarat, India, registered under the UCR using CDM methodology ACM0002. The project uses a jurisdictional baseline and a grid emission factor of 0.9 tCO₂/MWh, with leakage deemed negligible. However, the available record consists solely of a PDD; no verification reports, monitoring reports, or VVB documentation were found, leaving additionality, permanence, and verified emission reductions unconfirmed.

Red Flags

  • No additionality test type or VVB verification is documented in the available record, leaving the core additionality claim unverified
  • No buffer pool or permanence mechanism is stated, and no reversal events data is available for a project operating since 2016
  • Only a single PDD is available; no verification reports, monitoring reports, or VVB audit records were found despite a 9-year monitoring period (2016–2024)
  • No verified ERR figure exists to cross-check against the 189,246 tCO₂e claimed, making over- or under-crediting risk unassessable

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB verification found

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, consistent with power gen

Baseline

Jurisdictional but no reassessment date

Safeguards

Safeguards mentioned; FPIC and grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.