14 MW Wind Power Project in Maharashtra
#466of 1935 in Renewable energy#237of 975 in India#301of 1459 in CDM (UNFCCC)#164of 806 in AMS-I.D
Audit Analysis
A 14 MW onshore wind project in Maharashtra verified under CDM with a combined additionality test confirmed by TÜV NORD CERT and a jurisdictional grid-emission-factor baseline. The project type carries inherently low reversal and leakage risk, but the record is weakened by low extraction confidence, multiple inter-document contradictions (grid EF units, ERR figures, crediting-period dates), and 12 corrective action requests raised during verification. Overall a moderate-quality credit with manageable but non-trivial data-reliability concerns.
Red Flags
- Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of all extracted figures.
- The verified ERR (41,494 tCO₂) is roughly 2.4× the claimed ERR (17,613 tCO₂) in the 2020 monitoring report; if these refer to the same period the discrepancy is unexplained, and if they refer to different periods the record does not make that clear.
- Twelve corrective action requests and five clarification requests were raised during verification (all closed), indicating non-trivial data-quality issues in the project proponent's original submission.
- Grid emission factor appears in two different units across documents (0.82 tCO₂/MWh in the monitoring report vs 860 gCO₂/kWh in the validation report), creating ambiguity about which value was actually applied.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 44,078 | 0 | 44,078 | |
| 2015 | 40,703 | 0 | 40,703 | |
| 2016 | 38,263 | 0 | 38,263 | |
| 2019 | 46,649 | 0 | 46,649 | |
| 2021 | 12,856 | 0 | 12,856 | |
| Total | 182,549 | 0 | 182,549 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
Deemed negligible, 0% deduction
Jurisdictional, reassessment date not stated
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →