Skip to main content
CDMWindIndiaAMS-I.D

15 MW bundled grid connected renewable energy project in Maharashtra, India

CDM-4543 ↗

#467of 1935 in Renewable energy#238of 975 in India#302of 1459 in CDM (UNFCCC)#165of 806 in AMS-I.D

5.8/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
4.0

Audit Analysis

A 15 MW grid-connected wind project in Maharashtra with a well-established investment-test additionality confirmed by SGS UK and a jurisdictional grid baseline. The core methodology is sound and all nine validation corrective actions were resolved, but the absence of any monitoring-period data, verified emission reductions, and the low extraction confidence of the source documents limit confidence in actual delivery.

Red Flags

  • No monitoring-period data or verified emission reductions found in any available document, making it impossible to confirm actual credit delivery against the 216,270 tCO2e lifetime claim
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the extracted record may be incomplete
  • Grievance mechanism is not stated in any available document despite safeguards being mentioned

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

Negligible – grid-connected wind

Baseline

Jurisdictional grid EF (0.901)

Safeguards

FPIC done, grievance mechanism unstated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents