15 MW bundled grid connected wind energy project in Gujarat, India
#1449of 1935 in Renewable energy#796of 975 in India#1188of 1459 in CDM (UNFCCC)#481of 806 in AMS-I.D
Audit Analysis
A CDM wind energy project in Gujarat with a solid investment-test additionality assessment confirmed by the VVB and a jurisdictional grid baseline, but severely limited by the absence of any monitoring or verification data, a seven-fold discrepancy in claimed emissions reductions between the PDD and validation report, and low extraction confidence across the document set. The project is past its stated crediting period (ended January 2020), and no verified emissions reductions are available to confirm the ex-ante claims.
Red Flags
- Seven-fold discrepancy in total claimed emissions reductions: the PDD reports 195,153 tCO2 while the validation report reports 27,879 tCO2, both dated 13 November 2012 — a factor of ~7 that cannot be reconciled from the available documents
- No monitoring reports or verification reports found in the extracted record; total verified emissions reductions are not stated, making it impossible to confirm whether the project delivered on its claims
- Project name states 15 MW but the extracted capacity is 3.0 MW (2 × 1.5 MW machines), and the crediting period is stated as both 7 years (2013–2020) and 20 years in different fields
- Low extraction confidence flagged across the document set, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional but no reassessment data
Mentioned but FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →