15 MW Grid Connected Wind Energy Project at Sankaneri Village in Tamil Nadu
#905of 1935 in Renewable energy#450of 975 in India#633of 1459 in CDM (UNFCCC)#294of 806 in AMS-I.D
Audit Analysis
A 15 MW grid-connected wind project in Tamil Nadu validated under CDM with a VVB-confirmed investment additionality test, but the record is undermined by four cross-document contradictions (baseline method, leakage justification, FPIC status, additionality test type) and the absence of a verified ERR figure. The project is inherently low-risk for wind (minimal reversal and leakage exposure), yet the documentation gaps and inconsistent narratives prevent a higher confidence rating.
Red Flags
- Four contradictions between the validation report, PDD, and monitoring report on baseline method, leakage justification, FPIC, and additionality test type reduce data reliability
- Total verified ERR is not found in the extracted record, making it impossible to confirm actual delivery against the 371,445 tCO₂e lifetime claim
- Grid emission factor of 0.9321 tCO₂/MWh is from 2006 and no updated value is provided
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 51,135 | 0 | 51,135 | |
| 2011 | 71,191 | 0 | 71,191 | |
| 2013 | 37,439 | 0 | 37,439 | |
| Total | 159,765 | 0 | 159,765 |
Risk Indicators
VVB-confirmed investment test
wind has low inherent reversal risk
0% deduction; justification inconsistent across documents
Method contradictory; grid EF from 2006
Safeguards mentioned; FPIC contradictory; grievance mechanis
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →