Skip to main content
CDMWindIndiaAMS-I.D

15 MW Grid Connected Wind Energy Project at Sankaneri Village in Tamil Nadu

CDM-1049 ↗

#905of 1935 in Renewable energy#450of 975 in India#633of 1459 in CDM (UNFCCC)#294of 806 in AMS-I.D

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A 15 MW grid-connected wind project in Tamil Nadu validated under CDM with a VVB-confirmed investment additionality test, but the record is undermined by four cross-document contradictions (baseline method, leakage justification, FPIC status, additionality test type) and the absence of a verified ERR figure. The project is inherently low-risk for wind (minimal reversal and leakage exposure), yet the documentation gaps and inconsistent narratives prevent a higher confidence rating.

Red Flags

  • Four contradictions between the validation report, PDD, and monitoring report on baseline method, leakage justification, FPIC, and additionality test type reduce data reliability
  • Total verified ERR is not found in the extracted record, making it impossible to confirm actual delivery against the 371,445 tCO₂e lifetime claim
  • Grid emission factor of 0.9321 tCO₂/MWh is from 2006 and no updated value is provided

Credit Vintages

IssuedRetiredAvailable
2008
51,135051,135
2011
71,191071,191
2013
37,439037,439
Total159,7650159,765

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

wind has low inherent reversal risk

Leakage

0% deduction; justification inconsistent across documents

Baseline

Method contradictory; grid EF from 2006

Safeguards

Safeguards mentioned; FPIC contradictory; grievance mechanis

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents