16.5 MW Wind Power Project in Surajbari, Gujarat

CDM-5239 ↗

#20of 1935 in Renewable energy#12of 975 in India#12of 1459 in CDM (UNFCCC)#11of 1287 in ACM0002

7.0/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

A 16.5 MW wind power project in Gujarat, India, registered under CDM with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project delivered approximately 65% of its pro-rata expected emissions reductions over the monitored period, indicating conservative crediting. Minor administrative findings in the PDD (DNA name, grid information) were the only corrective actions, and no reversal or leakage risks are material for this avoidance-type project.

Red Flags

  • Grid emission factor is from 2008 and the PDD grid information was flagged as inconsistent with the current grid scenario in the validation report
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • The PDD (2022) describes a 'combined' additionality test while the validation report (2011) records an 'investment' test, creating ambiguity about the final validated basis

Credit Vintages

IssuedRetiredAvailable
2022
184,3070184,307
Total184,3070184,307

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for wind

Baseline

Jurisdictional grid EF (2008)

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents