Audit Analysis
A small 2.2 MW hydropower project in Madhya Pradesh registered under UCR with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of a project design document with no verification, monitoring, or VVB data. The complete absence of additionality documentation, verified emission reductions, and any third-party verification creates significant uncertainty about the project's integrity and claim safety.
Red Flags
- No additionality test type or VVB verification of additionality is documented in the available record
- No verification report, monitoring report, or VVB identification found — only a PDD is available
- No verified ERR figure exists to validate the 10,068 tCO2e claimed over the 2021–2024 monitoring period
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test documented
mixed evidence / unresolved risk
0% deemed negligible, reasonable for hydro
Jurisdictional but no reassessment data
Mentioned but FPIC and grievance unconfirmed
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →