2.2 MW hydropower plant in Birsinghpur, Madhya Pradesh of Ascent Hydro Projects Limited

UCR-522 ↗

#1695of 1935 in Renewable energy#120of 433 in Universal Carbon Registry (UCR)#619of 806 in AMS-I.D

3.3/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
5.5
Documentation
2.5

Audit Analysis

A small 2.2 MW hydropower project in Madhya Pradesh registered under UCR with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of a project design document with no verification, monitoring, or VVB data. The complete absence of additionality documentation, verified emission reductions, and any third-party verification creates significant uncertainty about the project's integrity and claim safety.

Red Flags

  • No additionality test type or VVB verification of additionality is documented in the available record
  • No verification report, monitoring report, or VVB identification found — only a PDD is available
  • No verified ERR figure exists to validate the 10,068 tCO2e claimed over the 2021–2024 monitoring period
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test documented

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, reasonable for hydro

Baseline

Jurisdictional but no reassessment data

Safeguards

Mentioned but FPIC and grievance unconfirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents