2.4 MW Wind Power Project at Tirunelveli Dist., Tamilnadu
#1288of 1935 in Renewable energy#683of 975 in India#1007of 1459 in CDM (UNFCCC)#415of 806 in AMS-I.D
Audit Analysis
A 2.4 MW onshore wind project in Tamil Nadu, India, validated under CDM methodology AMS I.D with a jurisdictional baseline and VVB-confirmed investment additionality test. The project design is sound and standard for its type, but the available documentation is limited to a 2011 validation report with no monitoring reports, no verified emission reduction figures, and low extraction confidence, making it difficult to confirm actual performance against the claimed 48,780 tCO₂e over the 10-year crediting period.
Red Flags
- No monitoring reports or verified emission reduction figures found in the extracted record; only the ex-ante claimed total of 48,780 tCO₂e is available
- Minimum extraction confidence rated low, and one of the eight source documents is listed as 'unknown', undermining confidence in the completeness of the evidence base
- Grievance mechanism explicitly absent and free, prior and informed consent not documented in available records
- Crediting period ended 1 November 2021, yet no post-crediting or final verification data is present
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Jurisdictional grid EF, standard CDM practice
Safeguards mentioned, no grievance mechanism, FPIC not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →