2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County

CDM-1721 ↗

#311of 1084 in China#433of 1459 in CDM (UNFCCC)#8of 28 in ACM0004

5.5/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A CDM energy-efficiency project (coke oven gas power generation) with well-supported additionality confirmed by DNV via a combined test, but significant gaps in monitoring data, baseline specificity, and post-validation documentation. The identical claimed and verified ERR figures (64,558 tCO₂e) raise questions about whether actual monitoring was conducted or the ex-ante estimate was simply carried forward.

Red Flags

  • Total ERR claimed and verified are identical (64,558 tCO₂e), suggesting the 'verified' figure may simply be the ex-ante estimate rather than an independently monitored result
  • No monitoring period, FNRB method, or usage monitoring method is stated in any available document
  • Only a validation report (April 2009) is clearly dated; no verification or monitoring reports appear in the evidence set despite a 10-year crediting period (2008–2018)
  • Baseline is project-specific with a grid emission factor from 2007 and no reassessment date recorded

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test; IRR below benchmark

Permanence

EE project; no inherent reversal risk

Leakage

Deemed negligible per ACM0004 methodology

Baseline

Project-specific; grid EF 2007; no reassessment date

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0004

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents