2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County

CDM-1721 ↗

4.2 / 10
Integrity
4.8
Transparency
3.6
Claim Safety
4.1
Documentation
4.2

Score Breakdown

Integrity

verified Additionality was confirmed by Det Norske Veritas Certification AS in the validation report, which is stronger than an unverified claim.

missing The validation report records multiple corrective actions and clarifications, and leakage treatment is not addressed in the extracted record.

Transparency

verified A named VVB is available, and the project is clearly identified as a CDM activity with a defined crediting period.

missing Key MRV fields such as the monitoring period, verified emission reductions, and usage monitoring details are not found in the available documents.

Claim Safety

verified The project uses ACM0004 under the CDM, which provides a recognized methodological framework.

missing The baseline is described only as project-based, leakage justification is not addressed, and there is no evidence in the extracted record to rule out over-crediting risk.

Documentation

verified Seven documents were used and the extraction confidence is medium rather than low.

missing The validation report is dated 2009, but several core fields remain missing or not stated, and the record includes many CARs and CLs.

Detailed Analysis

Integrity

The validation report from Det Norske Veritas Certification AS confirms additionality, which supports the project’s core environmental claim. However, the same report lists three corrective action requests and thirteen clarifications, indicating that the project design and evidence base needed substantial follow-up. Leakage is not addressed in the extracted record, and no buffer pool or reversal treatment is stated, so permanence and leakage robustness remain weak.

Transparency

Transparency is limited because several key monitoring and accounting fields are not found in the available documents, including the monitoring period, verified emission totals, and usage monitoring method. The project is clearly identified as CDM-1721 with a named verifier and a defined crediting period, which helps traceability. Still, the absence of quantified MRV outputs reduces confidence in public claim support.

Claim Safety

Claim safety is only moderate because the project uses a recognized CDM methodology, but the baseline is described only as project-based and not as a recently reassessed standardized baseline. Leakage justification is not addressed, and there is no verified usage-rate evidence in the extracted record. With no clear CORSIA or CCP status stated, the record does not provide strong protection against over-crediting or dual-claim concerns.

Documentation

Documentation quality is mixed. Seven documents were used and extraction confidence is medium, which is acceptable, but the validation report is old and the record still lacks several core quantitative fields. The many corrective actions and clarifications also suggest that the documentation package was not fully clean at validation.

Overall

I privileged the validation report’s statement that additionality was confirmed by the VVB over the contradictory lower-confidence reference to an investment-only test, because the validation report is the higher-priority and dated source. The contradiction does not overturn the additionality finding, but it does reduce confidence in the consistency of the record. Overall, the project looks procedurally legitimate under CDM, yet the missing MRV detail, unresolved leakage treatment, and numerous validation issues keep the quality score in the middle range.

Audit Analysis

This CDM project has some positive signs, including VVB-confirmed additionality and a named verifier, but the record also shows many unresolved validation issues and weak evidence on leakage and permanence. The documentation is incomplete for key MRV fields, and the project is not clearly positioned as low-risk for over-crediting or double-claim concerns.

Project Description

Status: Registered Type: PA Methodology: ACM4+ACM2 Project type: EE own generation Sub-type: Coke oven gas Region: Asia & Pacific Sub-region: East Asia Reductions 1st period: 64.558 ktCO2e/yr

Red Flags

  • The validation report lists many corrective actions and clarifications, which suggests substantial documentation and design issues at validation.
  • Leakage and permanence are not properly addressed in the extracted record, and no buffer pool or reversal treatment is stated.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report with verified emission reductions, monitoring period, and usage monitoring details.
  • Document leakage treatment, permanence safeguards, and the resolution of all CARs and clarifications in a complete audit trail.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

no buffer or reversal treatment stated

Leakage

leakage not addressed

Baseline

project baseline, reassessment not stated

Safeguards

FPIC noted, grievance mechanism not found

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti