2.75 MW Wind Power Project at Marudhar Fashions.
#1066of 1935 in Renewable energy#547of 975 in India#795of 1459 in CDM (UNFCCC)#346of 806 in AMS-I.D
Audit Analysis
A 2.75 MW wind project in India validated under CDM AMS I.D with a well-supported investment-test additionality case (IRR below WACC, confirmed by Bureau Veritas). However, the available record contains only the 2012 validation report with no monitoring or verification data, making it impossible to confirm actual delivery against the 41,470 tCO₂e lifetime claim. The low extraction confidence and absence of post-validation documentation significantly limit the reliability of the assessment.
Red Flags
- No monitoring or verification reports found in the extracted record — actual emissions reductions cannot be confirmed against the 41,470 tCO₂e lifetime claim
- Grid emission factor of 0.9062 tCO₂/MWh is from 2008 with no evidence of periodic update or baseline reassessment
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable
- 31 corrective action requests were raised during validation (all resolved), suggesting initial documentation gaps
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test, IRR below WACC
Avoidance project, no reversal risk
0% with justified rationale (new equipment)
Jurisdictional grid EF from 2008, no reassessment evidence
Local consultation done, no FPIC or grievance mechanism stat
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →