216 MWac Kamuthi Solar Power Project
#586of 1935 in Renewable energy#285of 975 in India#326of 1339 in Verra (VCS)#451of 1287 in ACM0002
Audit Analysis
The Kamuthi Solar Power Project is a 216 MWac solar PV avoidance project with a VVB-verified combined additionality test and a jurisdictional baseline, which are solid foundations. However, the verification report (November 2025) identified numerous data-quality corrections—including a non-conservative rounding error, missing meter calibration certificates, and multiple internal inconsistencies in the ER calculation sheet—all of which were remediated before approval. The project's inherent risk profile is low for a solar PV activity, but the absence of a stated buffer pool, the lack of FPIC, and contradictory leakage justifications between the monitoring and verification reports temper confidence.
Red Flags
- Four corrective action requests (CARs) were raised in the November 2025 verification report, including a non-conservative rounding of the 2020 ER value and missing meter calibration certificates, indicating data-quality weaknesses that required remediation.
- The monitoring report (September 2025) describes leakage as 'quantified' while the verification report (November 2025) records it as 'deemed negligible' with a 0% deduction—an inconsistency in how leakage was treated across documents.
- Free, Prior and Informed Consent (FPIC) was not conducted, and benefit-sharing documentation is contradictory between the monitoring report (described) and the verification report (not described).
- Registry status is 'Verification approval requested'—the project has not yet received final verification approval, so the credits are not yet issued.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 78,110 | 78,110 | 0 | |
| 2017 | 374,893 | 367,816 | 7,077 | |
| 2018 | 482,142 | 407,880 | 74,262 | |
| 2019 | 298,587 | 298,587 | 0 | |
| Total | 1,233,732 | 1,152,393 | 81,339 |
Risk Indicators
VVB-verified combined test
reversal risk minimal for solar
0% deduction; justification inconsistent across documents
Jurisdictional baseline; reassessment not yet due
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →