216 MWac Kamuthi Solar Power Project
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was confirmed by the VVB in the verification record.
missing Leakage justification is not addressed in the monitoring report, and the corrective actions show unresolved monitoring and metering issues.
Transparency
verified The monitoring period, VVB name, and claimed versus verified emission reductions are all stated in the monitoring report.
missing Several key operational details are missing or unclear, including usage monitoring method, leakage deduction, and the exact monitoring-period date boundaries.
Claim Safety
verified The project is an avoidance project under ACM0002 with claimed and verified reductions matching at 519,157 tCO2e.
missing Leakage treatment is inconsistent across documents, with the monitoring report saying it is not addressed while the validation report reportedly deemed it negligible.
Documentation
verified The record includes multiple official documents, including the PDD, validation report, monitoring report, and issuance-related material.
missing The monitoring report lists several corrective actions and the extraction confidence is not impaired, but the documentation still has missing meter and calibration details.
Detailed Analysis
Integrity
The project has a reasonably strong integrity profile because additionality was tested through an investment test and the VVB confirmed it in the verification record. The monitoring report reports no material findings, but leakage is not addressed there and the corrective actions request more evidence on metering, invoices, and the effect of higher generation on additionality. As this is an avoidance project, reversal risk is limited, but permanence is still not explicitly discussed through a buffer or reversal framework.
Transparency
Transparency is moderate because the monitoring report identifies the VVB, the monitoring period, and identical claimed and verified reductions of 519,157 tCO2e. At the same time, usage monitoring is not stated, leakage deduction is missing, and the report itself says the monitoring period is unclear about inclusion of the first and last dates. The registry status is only verification approval requested, so public-facing completeness appears incomplete.
Claim Safety
Claim safety is middling: the project uses ACM0002 and the claimed and verified issuance figures match, which reduces immediate over-crediting concern. However, the monitoring report does not address leakage, while the validation report reportedly considered it negligible, creating a reliability gap. The project is not CORSIA-eligible, which lowers dual-market claim risk, but CCP status is not stated.
Documentation
The file set is fairly broad, with the PDD, validation report, monitoring report, and issuance-related material all present, and extraction confidence is high. Even so, the monitoring report contains several corrective actions, including missing meter details, calibration records, and coordinate mismatches, which show documentation weaknesses. The crediting period is long and the monitoring period is later, but the record still lacks some operational specifics needed for a cleaner audit trail.
Overall
Overall, this is a mid-quality VCS renewable project with solid additionality evidence and matching claimed versus verified reductions, but it is held back by incomplete leakage treatment and several monitoring-document gaps. I privileged the monitoring report for operational facts because it is more recent than the validation report, but I noted the contradiction where the validation report reportedly deemed leakage negligible while the monitoring report says it is not addressed. I also gave weight to the monitoring report’s corrective actions and unclear meter evidence, which justify a downward adjustment in confidence and transparency.
Audit Analysis
This is a large renewable project with VVB-verified additionality and no material findings reported, which supports moderate integrity. However, leakage is not clearly addressed in the monitoring record, permanence is only indirectly relevant for an avoidance project, and the file contains several documentation gaps and a few contradictions that reduce confidence.
Project Description
This project in Tamil Nadu involves a 216 MWac solar power project that will replace anthropogenic greenhouse gas emissions estimated to be around 346,117 tCO2e per year. The project will also displace 3,58,559 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian electricity grid. The estimated GHG emission reductions for the 10-year renewable crediting period will be 34,61,169 tonnes of CO2. The project was open for public comment from May to June 2018, but no comments were received.
Red Flags
- Leakage is not addressed in the monitoring report, while the validation report reportedly treated it as negligible.
- The monitoring report includes multiple corrective actions, including unclear monitoring-period dates, missing meter details, and requests for additional invoices and calibration records.
- The project is not CORSIA-eligible, but CCP status is not stated, leaving some claim-safety uncertainty.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 78,110 | 78,110 | 0 | |
| 2017 | 374,893 | 367,816 | 7,077 | |
| 2018 | 482,142 | 407,880 | 74,262 | |
| 2019 | 298,587 | 298,587 | 0 | |
| Total | 1,233,732 | 1,152,393 | 81,339 |
Cosa migliorerebbe questo punteggio
- Provide a clear, reconciled leakage assessment and explain why the monitoring report differs from the validation report.
- Publish complete monitoring evidence, including meter inventories, calibration records, and unambiguous monitoring-period boundaries.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal events reported
Leakage not addressed in monitoring record
Project-specific baseline, reassessment timing not stated
FPIC, grievance mechanism, and safeguards documented
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →