24.45 MW Biomass based project in Punjab

VCS-1920 ↗

6.4 / 10
Integrity
6.8
Transparency
6.1
Claim Safety
5.8
Documentation
7.2

Score Breakdown

Integrity

verified Additionality was confirmed by Earthood Services Private Limited through an investment test in the validation/verification record.

missing Leakage is marked as not addressed, and no leakage deduction is stated in the monitoring report.

Transparency

verified The monitoring report is recent and specific, covering 2017-09-15 to 2020-12-31 and reporting 157,173 verified ERs.

missing The record does not state the usage monitoring method, and total ERs claimed are not found in the extracted documents.

Claim Safety

verified The project uses ACM0006 with a quantified grid emission factor of 0.9127, which supports a defined baseline framework.

missing Leakage is not addressed, which raises over-crediting risk for a biomass project where supply-chain effects can matter.

Documentation

verified Eleven documents were used, including issuance, PDD, validation report, and monitoring report, with high extraction confidence.

verified No material findings or corrective actions were reported, and the crediting period and monitoring period are both stated.

Detailed Analysis

Integrity

The project has a positive integrity signal because the validation/verification process confirmed additionality through an investment test, and the monitoring report reports no material findings. Still, the baseline is project-specific rather than a recently reassessed standardized baseline, and leakage is explicitly not addressed, which weakens the robustness of the crediting case. Permanence is also only partially evidenced because no buffer pool percentage or reversal history is stated in the available record.

Transparency

Transparency is moderate to good because the monitoring report is dated 2022-05-19, covers a clearly defined monitoring period, and reports 157,173 verified ERs. However, the extracted record does not state the usage monitoring method, and the total ERs claimed are not available, which limits full reconciliation of issuance claims. The VVB is named, but registry completeness around claim quantities is incomplete in the extracted documents.

Claim Safety

Claim safety is weakened by the absence of leakage treatment and by the use of a project-specific baseline rather than a more conservative standardized or jurisdictional baseline. The methodology and grid emission factor are clearly stated, which helps, but the lack of leakage justification increases the risk of over-crediting. CORSIA eligibility and CCP status are not stated in the available record, so dual-market claim risk cannot be ruled out from the extracted facts alone.

Documentation

Documentation quality is fairly strong: eleven documents were used, including issuance, PDD, validation report, and monitoring report, and extraction confidence is high. The record also shows no material findings and no corrective actions required, which suggests a clean verification trail. The crediting period and monitoring period are both stated, supporting recency and traceability of the evidence set.

Overall

The project appears moderately credible on documentation and additionality, but it is held back by incomplete treatment of leakage and missing permanence details. There are no contradictions listed in the extracted facts, so no document hierarchy conflict needed to be resolved. Because the project-specific baseline and unaddressed leakage create meaningful quality risk, the score remains mid-range rather than strong.

Audit Analysis

This biomass project shows a reasonably solid documentation trail and a VVB-confirmed investment test for additionality, with no material findings reported in the monitoring report. However, the baseline is project-specific rather than standardized, leakage is not addressed, and key permanence details such as buffer coverage or reversal history are not stated in the available documents.

Project Description

Proponent: Satia Industries Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0006 Estimated annual GHG reductions: 208613 tCO2e Region: Asia Registration date: 2019-09-17

Red Flags

  • Leakage treatment is not addressed, with no deduction or justification stated in the monitoring report.
  • No buffer pool percentage or reversal history is stated, leaving permanence controls unclear.

Credit Vintages

Issued Retired Available
2017
11,166 0 11,166
2018
43,878 0 43,878
2019
53,250 0 53,250
2020
48,879 0 48,879
Total 157,173 0 157,173

Cosa migliorerebbe questo punteggio

  • Provide a quantified leakage assessment and, if appropriate, a conservative leakage deduction with clear justification.
  • Disclose buffer pool coverage or other permanence safeguards, along with any reversal monitoring or incident history.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer or reversal detail stated

Leakage

Leakage not addressed

Baseline

Project-specific baseline

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti