Skip to main content
CDMWindIndiaAMS-I.D

3.3 MW Bundled Wind power project at Theni, Tamilnadu

CDM-6498 ↗

#1of 1935 in Renewable energy#1of 975 in India#1of 1459 in CDM (UNFCCC)#1of 806 in AMS-I.D

7.4/ 10
Integrity
7.5
Transparency
7.0
Claim Safety
7.5
Documentation
7.5

Audit Analysis

A standard CDM grid-connected wind project with a VVB-verified investment additionality test, a jurisdictional (grid emission factor) baseline, and no permanence or leakage concerns typical of wind generation. All ten material findings raised during validation were documentation or clarification issues that were corrected before issuance. The project is well-documented with high extraction confidence across seven source documents, though safeguards detail (FPIC, grievance mechanism) is thin.

Red Flags

  • Safeguards are mentioned in the PDD but FPIC and grievance mechanism details are not found in the extracted record, leaving community engagement evidence incomplete.
  • Grid emission factor of 0.916 tCO₂/MWh is fixed from 2011; if the Indian grid has decarbonised since then, the per-MWh credit may overstate actual displacement, though this is standard CDM practice at approval.

Credit Vintages

IssuedRetiredAvailable
2015
11,707011,707
Total11,707011,707

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Wind power – no reversal risk

Leakage

Negligible – grid displacement

Baseline

Jurisdictional grid EF (0.916, 2011)

Safeguards

Mentioned but FPIC/grievance detail absent

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.D – Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents