3.75 MW Bundled Wind Power Project in Maharashtra
#642of 1935 in Renewable energy#318of 975 in India#436of 1459 in CDM (UNFCCC)#221of 806 in AMS-I.D
Audit Analysis
A 3.75 MW wind project in Maharashtra validated under CDM AMS I.D v13 with a VVB-confirmed investment additionality test and a jurisdictional baseline drawn from the CEA grid database. The project is fundamentally sound in design, but the available record contains no monitoring or verification data, no safeguards detail beyond a general mention, and a low extraction confidence that limits assurance. The two minor contradictions (leakage characterisation and crediting-period precision) are resolved in favour of the validation report.
Red Flags
- No monitoring reports or verified ERR figures are present in the extracted record, so actual delivery against the 56,500 tCO₂e lifetime claim cannot be confirmed.
- Safeguards are only generically mentioned; no FPIC process, grievance mechanism, or stakeholder-consultation detail is documented in the available files.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the full evidentiary picture may be incomplete.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0 % deemed negligible; minor doc inconsistency
Jurisdictional CEA grid EF, 2006 ref.
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →