30 MW wind power project at Surajbari, Gujarat in India
#1284of 1935 in Renewable energy#679of 975 in India#1005of 1459 in CDM (UNFCCC)#999of 1287 in ACM0002
Audit Analysis
A 30 MW CDM wind project in Gujarat with VVB-confirmed additionality and a specific grid emission factor, but undermined by three material contradictions between the validation and monitoring reports (baseline method, leakage justification, and ERR figures). The monitoring report shows ER roughly 2.8× the pro-rata ex-ante expectation for the elapsed period, which warrants scrutiny. Key verification data (verified ER, FNRB, usage monitoring) are absent from the extracted record.
Red Flags
- ERR in the monitoring report (67,740 tCO₂e for ~3 years) is approximately 2.8× the pro-rata ex-ante estimate from the validation report (56,932 tCO₂e over 7 years → ~24,400 expected for 3 years), raising over-crediting or calculation-error concerns
- Baseline method is stated as 'project' in the monitoring report but 'jurisdictional' in the validation report — a fundamental methodological inconsistency for a wind project where the grid EF baseline is standard
- Leakage justification is contradictory: 'quantified' in the monitoring report versus 'deemed negligible' in the validation report, with a 0% deduction in both cases
- Total verified ER is not stated in any available document, preventing independent confirmation of actual emissions reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 25,117 | 0 | 25,117 | |
| 2013 | 19,407 | 0 | 19,407 | |
| 2022 | 171,753 | 0 | 171,753 | |
| Total | 216,277 | 0 | 216,277 |
Risk Indicators
VVB-confirmed but test type not stated
mixed evidence / unresolved risk
0% deduction with contradictory justification
Method contradictory across documents; reassessed 2020
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →