No public grade applies yet
300 MW Thar Solar Project in Rajasthan
- Standard
- GCC
- Registry
- GCC-37 ↗ · Registered
- Country
- India
- Developer
- Thar Surya 1 Private Limited
CarbonMeld's document-based rating gives 300 MW Thar Solar Project in Rajasthan (GCC-37) no number (No public grade applies yet): CarbonMeld read its documents, but its type of project does not yet have a public grade that applies to it on both additionality and quantification. The absence of a number says nothing about the project's quality.
Assessment
How this analysis was made
- Standard
- Global Carbon Council (GCC)
- Methodology
- GCCM001 Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers No methodology-specific rules: the general rules apply. Read the general rules
- Our method
- CarbonMeld methodology v3 · documents read on 29 Oct 2026
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
Issuance data not yet available — check back soon.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). 300 MW Thar Solar Project in Rajasthan (GCC-37): CarbonMeld document-based analysis, methodology v3, documents read on 29 Oct 2026. https://carbonmeld.com/projects/300-mw-thar-solar-project-in-rajasthan/.
The citation names the analysis by its methodology version and the day the documents were read; the page gives no number.
Similar projects
Same methodology or sector, the same registry first.
- 7.5MW(AC) grid connected canal top solar PV power plant by CSEPL in Patiala district of Punjab,IndiaGCC-100
- 10 MW Solar Project in KarnatakaGCC-1156
- Solar PV based power generation project in Telangana by Shalaka Infra TechGCC-805
- Solar Power Project in Andhra Pradesh, IndiaGCC-820
- 70 MW Bundled Solar Project at Maharashtra & KarnatakaGCC-377
- Hongda Zhongyuan Ordos City Hangjinqi 30MW Solar Power ProjectGCC-207
- Sinenergy Solar Power ProjectGCC-781
- Solar Power Project by ES SunGCC-424
