300 MW Wind Power Project by SITAC Kabini in Gujarat
GS-2410 ↗ · current registry ID: GS7678
#643of 1935 in Renewable energy#319of 975 in India#341of 1801 in Gold Standard (GS)#497of 1287 in ACM0002
Audit Analysis
A 300 MW grid-connected wind project in Gujarat with a jurisdictional baseline and VVB-confirmed combined additionality test, but the verification report identified 13 material findings and 22 corrective actions, reflecting significant documentation gaps. The ERR figures show a contradiction between the monitoring report and the verification report, and FPIC was not conducted. For a wind avoidance project, fundamental integrity risks (permanence, reversal) are low, but the volume of unresolved documentation issues and the leakage justification discrepancy warrant caution.
Red Flags
- 13 material findings and 22 corrective actions identified in the verification report, including missing income generation values, misaligned monitoring periods, and inconsistent electricity generation figures
- ERR contradiction: monitoring report states 999,168 while the verification report states 1,101,498.05 for the same period
- FPIC was not conducted despite safeguards being mentioned; stakeholder feedback round was deferred due to COVID-19 and still pending
- Leakage justification is inconsistent: the verification report (2025) states 'deemed negligible' while an earlier appendix (2021) references a 'quantified' approach
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 153,144 | 0 | 153,144 | |
| 2023 | 846,024 | 0 | 846,024 | |
| Total | 999,168 | 0 | 999,168 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Jurisdictional, 2021 grid EF
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →