37.5 MW Wind power project at Pratapgarh, Rajasthan

CDM-10163 ↗

#241of 1935 in Renewable energy#119of 975 in India#149of 1459 in CDM (UNFCCC)#175of 1287 in ACM0002

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A 37.5 MW wind project in Rajasthan with a jurisdictional baseline and VVB-confirmed combined additionality test. The project delivered roughly 79% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Seven corrective action requests during validation reveal initial documentation gaps, but all were addressed before issuance.

Red Flags

  • Seven corrective action requests (CARs) were raised during validation, including sensitivity analysis performed for 51 MW instead of the implemented 37.5 MW capacity and missing investment analysis spreadsheets for the correct capacity
  • Grid emission factor fixed at 0.9582 tCO2/MWh from 2012 with no evidence of periodic update or reassessment over the 10-year crediting period
  • No buffer pool or explicit permanence mechanism documented, and no reversal-event tracking protocol found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2023
338,1190338,119
Total338,1190338,119

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, 0% deduction

Baseline

Jurisdictional, grid EF fixed at 2012 value

Safeguards

Mentioned and benefit sharing described, but FPIC and grieva

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents