37.5 MW Wind power project at Pratapgarh, Rajasthan
#241of 1935 in Renewable energy#119of 975 in India#149of 1459 in CDM (UNFCCC)#175of 1287 in ACM0002
Audit Analysis
A 37.5 MW wind project in Rajasthan with a jurisdictional baseline and VVB-confirmed combined additionality test. The project delivered roughly 79% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Seven corrective action requests during validation reveal initial documentation gaps, but all were addressed before issuance.
Red Flags
- Seven corrective action requests (CARs) were raised during validation, including sensitivity analysis performed for 51 MW instead of the implemented 37.5 MW capacity and missing investment analysis spreadsheets for the correct capacity
- Grid emission factor fixed at 0.9582 tCO2/MWh from 2012 with no evidence of periodic update or reassessment over the 10-year crediting period
- No buffer pool or explicit permanence mechanism documented, and no reversal-event tracking protocol found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 338,119 | 0 | 338,119 | |
| Total | 338,119 | 0 | 338,119 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Deemed negligible, 0% deduction
Jurisdictional, grid EF fixed at 2012 value
Mentioned and benefit sharing described, but FPIC and grieva
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →