Skip to main content
CDMSolarIndiaAMS-I.D

3MWp Grid Connected Solar Power Project at Yalesandra Village, Kolar District, Karnataka, India

CDM-5560 ↗

#411of 1935 in Renewable energy#209of 975 in India#259of 1459 in CDM (UNFCCC)#146of 806 in AMS-I.D

5.9/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A straightforward 3 MWp grid-connected solar project under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid emission factor baseline. Multiple material findings during validation (calibration delays, PDD discrepancies, investment analysis corrections) were addressed but reduce confidence in the underlying data. The project delivered approximately 95% of its pro-rata ex-ante expectation over the monitored period, indicating conservative crediting.

Red Flags

  • Energy meter calibration was performed only twice during the monitoring period instead of annually as required by the registered plan, necessitating a conservative ±1% MPE adjustment
  • Discrepancies between the PDD description and actual site conditions regarding solar arrays and module types were identified during validation
  • Investment analysis spreadsheet and financial parameters required multiple corrections and clarifications before VVB sign-off
  • No buffer pool or permanence mechanism is documented for this CDM project, and no reversal event data is available

Credit Vintages

IssuedRetiredAvailable
2021
16,826016,826
Total16,826016,826

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for grid-connected solar

Baseline

Jurisdictional grid EF (0.9446, 2009)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents