4.275MW Small Scale Bundle Wind Energy Project by M/s Biotech Vision Care Pvt.Ltd. & Dr. Arun Mehra in Tamilnadu, India
#816of 1935 in Renewable energy#413of 975 in India#572of 1459 in CDM (UNFCCC)#278of 806 in AMS-I.D
Audit Analysis
A 4.275 MW CDM wind project in Tamil Nadu with a solid investment-test additionality assessment confirmed by SIRIM QAS and a jurisdictional grid baseline. However, the extracted record contains no monitoring or verification data, the extraction confidence is low, and a minor contradiction exists in how leakage is characterised between the PDD and the validation report. The project is fundamentally sound in design but the available evidence base is thin.
Red Flags
- Low extraction confidence indicates at least one key document was poorly readable, limiting the reliability of the extracted data
- No monitoring period or verified ERR figures are present in the extracted record, preventing any delivery check against the 91,540 tCO2e lifetime claim
- Contradiction between the PDD (leakage 'quantified') and the validation report (leakage 'deemed negligible') creates ambiguity in the leakage treatment
- Grid emission factor of 0.9451 tCO2/MWh is from 2009 with no evidence of any subsequent update or reassessment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test, IRRs below hurdle
Wind displacement, no reversal risk or events
0% deduction, PDD vs VR contradiction
Jurisdictional grid EF, standard approach
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →