Audit Analysis
A small 4.85 MW grid-connected solar PV project in South Korea with a sound jurisdictional baseline and VVB-confirmed investment additionality, but the verification process surfaced ten corrective action requests including a baseline calculation error, missing QA/QC procedures, and unsupported NPV inputs. The project type carries inherently low reversal and leakage risk, yet the volume of documentation deficiencies and several unquantified parameters (FNRB, usage monitoring, buffer pool) limit confidence in the credit's robustness.
Red Flags
- Ten corrective action requests (CARs) were raised during verification, including a baseline emission reduction calculation that omitted 2008 data (CAR 06) and a mis-calculation in the raw-data table (CAR 04), both of which could have inflated or distorted the claimed ERR.
- The NPV additionality calculation lacked objective evidence for initial investment cost and discount rate (CAR 10), weakening the investment-test basis on which additionality was confirmed.
- QA/QC management for monitoring equipment was not established at the Hoengseong site (CAR 03) and periodic re-calibration was not addressed in the PDD (CAR 07), raising concerns about the reliability of generation data used to verify ERR.
- FNRB value, usage monitoring method, and buffer pool percentage are all absent from the extracted record, leaving key MRV parameters unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 4,279 | 0 | 4,279 | |
| Total | 4,279 | 0 | 4,279 |
Risk Indicators
Investment test confirmed by VVB (KSA)
Solar PV avoidance project; no reversal risk inherent
0 % deduction; deemed negligible for small grid-connected so
Jurisdictional grid EF, but CAR 06 flagged a calculation err
Safeguards mentioned and benefit sharing described, but FPIC
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →