4.95 MW Bundled Wind Power Project in Theni, Tamilnadu, India
#1404of 1935 in Renewable energy#757of 975 in India#1133of 1459 in CDM (UNFCCC)#459of 806 in AMS-I.D
Audit Analysis
A 4.95 MW bundled wind project under CDM with a verified investment-test additionality and a standard jurisdictional grid baseline, but the validation report contains 15 material findings covering financial-analysis errors, cost inconsistencies, and tax-calculation mistakes that undermine confidence in the additionality analysis. No monitoring-period data, verified emission-reduction figures, or FNRB values are available in the extracted record, and the crediting period expired in March 2022. The project is a straightforward wind-displacement project with reasonable leakage treatment, but the documentation gaps and low extraction confidence limit the overall assessment.
Red Flags
- 15 material findings in the validation report, including cost figures exceeding TNERC-recommended levels, inconsistent PLF assumptions between the two bundled companies, missing T&D loss data for one company, tax-calculation errors, and a benchmark calculation period that does not match the PDD narrative
- Contradiction in total claimed ERR: the validation report states 123,280 tCO₂e while a financial document lists 4,022 tCO₂e — the basis for the lower figure is unexplained
- No monitoring-period data, verified ERR figures, or FNRB values found in any available document; the crediting period (2012–2022) has expired with no post-verification record in the extracted set
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and some facts may be missing
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no reversal data
0 % deemed negligible (wind)
Jurisdictional grid EF (2009); no reassessment data
Safeguards mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →