Skip to main content
CDMWindIndiaAMS-I.D

4 MW Wind Power Project by Varun Industries Ltd. in Tamil Nadu, India

CDM-6237 ↗

#334of 1935 in Renewable energy#177of 975 in India#208of 1459 in CDM (UNFCCC)#123of 806 in AMS-I.D

6.0/ 10
Integrity
7.2
Transparency
4.8
Claim Safety
6.0
Documentation
5.2

Audit Analysis

A 4 MW wind project in Tamil Nadu with a well-supported investment-test additionality (IRR below benchmark without CDM revenues) and a standard jurisdictional grid baseline. However, the absence of any monitoring-period data, verified emission reductions, or safeguards documentation (FPIC, grievance mechanism) limits confidence in real-world performance and social compliance.

Red Flags

  • No monitoring reports or verified ERR figures are available in the extracted record, so actual performance cannot be confirmed against the 87,950 tCO₂e lifetime claim.
  • Free, Prior and Informed Consent (FPIC) and a grievance mechanism are not documented in any available source.
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claiming risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

0% with valid justification

Baseline

Jurisdictional grid EF (2011)

Safeguards

Mentioned but FPIC/grievance absent

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents