400 MW Solar Power Project at Bhadla, Rajasthan, India

GS-1455 ↗

5.2 / 10
Integrity
5.2
Transparency
6.0
Claim Safety
4.5
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB in the verification report (verification report, 2020-03-27).

missing Project uses a project-specific baseline (ACM0002) and shows inconsistent leakage treatment (verification report vs monitoring report), lowering baseline/leakage robustness.

Transparency

verified VVB named (LGAI Technological Center, S.A.) and monitoring period provided (2023-04-01 — 2023-12-31); 21 documents extracted.

inferred ✗ Moderate extraction confidence and contradiction in core figures (ERRs), which reduces reliability of published numbers.

Claim Safety

missing Project-level baseline (ACM0002) and inconsistent leakage justification increase over-crediting risk.

missing Discrepancy between total ERR claimed (519,243) and differing verified totals across documents increases double-counting/over-claim concern.

Documentation

verified Many documents were used (n=21) and core safeguards (FPIC, grievance) and benefit sharing are documented.

inferred ✗ Min extraction confidence is medium and there are important contradictions (additionality test type, leakage handling, ERR figures) plus seven CARs, lowering documentation reliability.

Detailed Analysis

Integrity

Additionality is documented and was confirmed by the VVB in the verification report (verification report, 2020-03-27), which supports basic additionality. However, the project uses a project-specific baseline under ACM0002 (PDD/validation documents), not a jurisdictional baseline, which is weaker for baseline validity. Leakage is reported as a 0% deduction with a 'quantified' justification in the verification report, but the monitoring report later states leakage was not addressed; this inconsistency and the presence of seven corrective action requests in the verification report undermine confidence in leakage and corrective action closure. No buffer pool percentage or reversal events are documented in the extracted record.

Transparency

A named VVB (LGAI Technological Center, S.A.) and a recent monitoring period (2023-04-01 — 2023-12-31) are provided, and 21 documents were used, indicating decent disclosure. However, extraction confidence is only medium and there are explicit contradictions in key metrics (total emission reductions verified), which reduce the reliability of the reported figures. The registry is listed as Gold Standard, but CORSIA/CCP status is not stated in the available extracts.

Claim Safety

There is elevated risk of over-crediting: the project applies a project-level baseline (ACM0002) rather than a jurisdictional baseline, leakage justification is inconsistent across documents, and verified emission reduction figures contradict each other (519,243 claimed versus differing verified totals). CORSIA/CCP eligibility is not stated, so dual-claim risk cannot be ruled out.

Documentation

Evidence includes verification, validation, monitoring report and PDD entries and a reasonable document count (21), which is positive. Nevertheless, documents contain contradictions (additionality test type differs between validation and later monitoring, leakage treatment differs, and verified ERR totals differ across documents). Extraction confidence is medium and seven corrective action requests are outstanding in the verification report, reducing documentation quality.

Overall

I privileged the values from the verification report and the most recent monitoring report where possible but must note three contradictions: (1) additionality test type — validation (2020-03-27) records a combined test while a later monitoring report (2025-04-22) reports investment; I privileged the more recent monitoring report for test-type characterization but treated this as an indicator of inconsistent reporting and reduced scores. (2) leakage justification — verification report (2020-03-27) states leakage was quantified while the monitoring report (2025-04-22) says leakage was not addressed; I flagged this as a reliability issue and downgraded leakage and integrity scores. (3) total verified ERR — two different verified totals appear (430,919 in a 2024 source vs 909,798 in a 2023 source); because the verification report and the merged record carry 430,919 and the verification report is a formal VVB output, I gave more weight to the verified figure reported by verification outputs but treated the discrepancy as a major red flag and reduced transparency and claim-safety accordingly. Overall score is a weighted average reflecting these positives and concerns (additionality VVB confirmation and documented safeguards vs inconsistent leakage treatment, multiple CARs and ERR discrepancies).

Audit Analysis

The project shows some integrity: additionality was confirmed by a VVB and safeguards (FPIC, grievance mechanism) are documented, but project-level baseline choice, inconsistent leakage treatment, multiple corrective actions, and large discrepancies in claimed/verified emission reductions reduce confidence. Documentation is present but contains contradictions and moderate extraction confidence.

Project Description

The project activity generates electricity using renewable solar energy. The generated electricity is exported to the regional grid system, which is under the purview of the INDIAN electricity grid of India. The project activity reduces anthropogenic emissions of greenhouse gases estimated to be approximately 694,471 tCO2e per year, thereon replacing 732,874 MWh/year amount of electricity with renewable energy. The project diversifies the mix of power plants connected to the INDIAN GRID, which is mainly dominated by thermal/fossil-fuel based power plants. Project impacts and benefits: During the current monitoring period, SB Energy has conducted 27 training sessions to educate and build capacity, including: Awareness training on Tobacco day, to increase understanding of the impact tobacco has on cardiovascular health and the feasible actions that the public can take to reduce the risks to heart health posed by tobacco. "Cardiovascular diseases (CVD), including stroke, are the world’s leading causes of death, and tobacco use is the second leading cause of CVDs" Firefighting Drill Training, to review the emergency preparedness plan of the organization and evaluate standard operating procedures, so that concerned persons would deliver their duties effectively while keeping in cognizance of life and property. If the employees and concerned stakeholders are trained, then the response during emergency would be smooth and effective. Medical camps encouraged the use of available nutritious food products in the area. This activity was organized with the aim to improve the nutritional status of the population and especially targeted families. The food-preparation based nutrition approach was undertaken to create awareness to enhance consumption of nutritionally rich fruits, vegetables and ingredients. The team members made a comprehensive presentation to promote and emphasize the importance of dietary variety in order to improve the nutritional quality of t

Red Flags

  • Contradictory verified ERR figures across documents (430,919 vs 909,798).
  • Seven corrective action requests found in the verification report.
  • Leakage justification inconsistent: one document says quantified, another says not addressed.

Credit Vintages

Issued Retired Available
2019
665,990 656,629 9,361
2020
935,664 913,952 21,712
2021
932,161 231,742 700,419
2022
909,798 214,605 695,193
2023
216,830 0 216,830
Total 3,660,443 2,016,928 1,643,515

Cosa migliorerebbe questo punteggio

  • Resolve contradictions in verified emission reduction figures and publish a reconciled, VVB-signed statement.
  • Provide clear, consistent leakage analysis and documentation showing how the 0% leakage deduction was justified, and close the seven corrective action requests with evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

buffer/reversal not documented

Leakage

inconsistent treatment

Baseline

project-level baseline

Safeguards

FPIC and grievance present

Double-claim

CORSIA/CCP status unclear

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti