42 MWP BUNDLED SOLAR PHOTOVOLTAIC POWER PROJECT IN INDONESIA
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reports no material findings.
missing Leakage is not addressed in the verification report, and reversal events are not addressed; the baseline is project-specific rather than a more robust standardized or jurisdictional approach.
Transparency
verified The project has a named VVB, a defined monitoring period, and a verified issuance figure of 85,939 tCO2e.
missing The extracted record does not state the claimed issuance amount, and key MRV details such as usage monitoring method and grid emission factor are not found in available documents.
Claim Safety
verified The project is an avoidance project under Gold Standard and the verification report confirms additionality.
missing Leakage treatment is inconsistent across documents, and the project is marked CORSIA-eligible while CCP status is not stated, leaving some dual-claim uncertainty.
Documentation
verified Twenty documents were used, including validation, monitoring, PDD, and verification materials, and safeguards are mentioned with FPIC and a grievance mechanism.
missing Extraction confidence is low, several fields are not stated in available documents, and the crediting period contradiction suggests documentation quality issues.
Detailed Analysis
Integrity
The verification report from 2023-04-20 confirms additionality through VVB review and reports no material findings or corrective actions. Integrity is weakened because the baseline is described only as a project baseline, leakage is not addressed in the verification report, and reversal events are not addressed in the extracted record.
Transparency
Transparency is moderate because the project has a named verifier, a clear monitoring period from 2022-07-01 to 2023-12-31, and a verified issuance total of 85,939 tCO2e. But the claimed issuance amount is not found in the extracted record, and important MRV details such as the usage monitoring method and grid emission factor are not stated in available documents.
Claim Safety
Claim safety is helped by the project type, Gold Standard certification, and VVB-confirmed additionality. It is reduced by the leakage inconsistency between the verification report and monitoring report, and by the fact that CORSIA eligibility is true while CCP status is not stated, which leaves some residual double-claim risk.
Documentation
Documentation quality is mixed: twenty documents were used, including validation, monitoring, PDD, and verification materials, and safeguards such as FPIC, grievance mechanism, and benefit sharing are documented. However, extraction confidence is low, several key fields are not stated in available documents, and the crediting period contradiction between the verification and validation reports lowers confidence further.
Overall
I privileged the verification report for leakage and reversal-related statements because it is the more direct assurance document, but I also noted that the monitoring report says leakage is negligible, so the record contains a real contradiction. I privileged the verification report for the earlier crediting period because it is the document explicitly extracted here, while the validation report suggests a later period; this discrepancy should be resolved against the registry and latest approved project documents. Overall, the project looks credible but not high-confidence because of low extraction confidence, missing MRV specifics, and contradictory statements on leakage and crediting period.
Audit Analysis
This is a certified Gold Standard solar project with VVB-confirmed additionality and no material findings reported in the verification record. However, several key items are either not stated or internally inconsistent, including leakage treatment, reversal handling, and the crediting period, which weakens confidence in the documentation and claim safety.
Project Description
The project activty is setting up four number of Solar power projects (7 MWp, 7p MW, 7 MWp & 21 MWp) in Indonesia with the total installed capacity of 42 MWp. The electricity generated by the ITA, ITB & ITC projects export to the Lombok Power Grid and the electricity generated from the ITL project exports power to Sulutgo grid. The project activity will therefore displace an equivalent amount of electricity which would have otherwise been generated by fossil fuel dominant electricity grid.
Red Flags
- Leakage is not addressed in the verification report, while the monitoring report says it is negligible; this inconsistency reduces reliability.
- The crediting period differs between the verification report and the validation report, creating uncertainty about which period is current.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 27,635 | 27,635 | 0 | |
| 2020 | 58,304 | 58,304 | 0 | |
| Total | 85,939 | 85,939 | 0 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled, registry-backed statement on the correct crediting period and leakage treatment across validation, monitoring, and verification documents.
- Provide complete MRV documentation, including usage monitoring method, grid emission factor basis, and a clearer explanation of reversal and permanence handling.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
reversal risk not addressed
leakage treatment inconsistent
project baseline only
FPIC and grievance mechanism present
CORSIA-eligible; CCP status unstated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →