53.75 MW Bundled wind Power project in Tamil Nadu and Karnataka by KBD Group, India
#819of 1935 in Renewable energy#417of 975 in India#507of 1339 in Verra (VCS)#637of 1287 in ACM0002
Audit Analysis
A 53.75 MW bundled wind project in India with VVB-confirmed additionality and conservative delivery (approximately 69% of the pro-rata ex-ante expectation), but undermined by material findings on meter calibration, eleven corrective actions, a contradiction in baseline method between the verification and monitoring reports, and a complete absence of documented safeguards, FPIC, or grievance mechanisms. The low extraction confidence across 19 source documents further limits assurance in the extracted record.
Red Flags
- Eleven corrective actions (CAR-01 through CAR B2) were required by the VVB, indicating systemic monitoring and reporting deficiencies
- Meter calibration was not performed annually as required, and a 1,271.88 tCO2 discrepancy between calculated and reported ERR was identified in the verification report
- No FPIC, grievance mechanism, or safeguards documentation found in the verification report; the PDD (2009) claims safeguards were addressed, creating a direct contradiction
- Baseline method is stated as 'project-specific' in the verification report but 'jurisdictional' in the monitoring report — an unresolved contradiction affecting baseline credibility
- Low extraction confidence across the 19-document record limits the reliability of the structured data used for scoring
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 15,000 | 15,000 | 0 | |
| 2008 | 102,485 | 102,485 | 0 | |
| 2009 | 81,171 | 81,171 | 0 | |
| 2010 | 90,992 | 90,992 | 0 | |
| 2011 | 71,318 | 68,524 | 2,794 | |
| 2012 | 68,692 | 68,692 | 0 | |
| 2013 | 89,473 | 89,473 | 0 | |
| 2014 | 15,305 | 15,305 | 0 | |
| Total | 534,436 | 531,642 | 2,794 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' without quantitative support
Project-specific baseline, method contradicted by monitoring report
No FPIC, no grievance mechanism, safeguards absent in verification report
CORSIA not eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →