5MW Thap Sakae Photovoltaic Solar Cell Power Plant Project, Thailand

CDM-10194 ↗

#820of 1935 in Renewable energy#16of 48 in Thailand#575of 1459 in CDM (UNFCCC)#280of 806 in AMS-I.D

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A 5 MW solar PV project in Thailand registered under CDM with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The project's fundamental design is sound, but the verification process surfaced 14 material findings and 11 corrective actions covering grid-EF calculation errors, NCV value mistakes, and Build Margin omissions, indicating significant initial quality-control weaknesses that were subsequently remediated. Monitoring data is limited to a single 8-month period from 2017, and several key transparency fields (FNRB, usage monitoring, CORSIA/CCP status) are absent from the extracted record.

Red Flags

  • 14 material findings and 11 corrective actions identified during verification, including errors in grid emission factor calculation, NCV values, fuel consumption data, and Build Margin exclusion of CDM-registered projects — all corrected but indicating weak initial QA/QC
  • Total verified ERR (1,788 tCO2e for 8 months) is approximately 74% of the pro-rata expectation (~2,412 tCO2e) derived from the PDD lifetime estimate of 36,180 tCO2e over ~10 years, suggesting potential over-crediting in the ex-ante estimate or seasonal under-delivery
  • No buffer pool percentage stated and no reversal events data available, leaving permanence risk unquantified despite the project being an avoidance-type credit
  • Monitoring data is limited to a single 8-month period (Aug 2016 – Mar 2017) with no subsequent monitoring reports found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2018
1,78801,788
Total1,78801,788

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

Avoidance project

Leakage

0% deduction, negligible for grid-connected solar

Baseline

Jurisdictional grid EF, standard for AMS-I.D

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents