6.55 MW Renewable energy generation project, India
#535of 1935 in Renewable energy#269of 975 in India#352of 1459 in CDM (UNFCCC)#190of 806 in AMS-I.D
Audit Analysis
A grid-connected wind energy project in India using a jurisdictional baseline and investment-test additionality, verified by RINA Services. A material finding led to a 64% capacity reduction (6.55 MW to 2.35 MW) due to additionality failures on the NMPL component, and a ~10% discrepancy exists between two monitoring reports on total ERR. The remaining project is methodologically sound but carries notable data-reliability concerns.
Red Flags
- Material finding: 4.2 MW (2 × 2.1 MW NMPL turbines) was withdrawn during validation because the project proponent could not demonstrate prior consideration of CDM, reducing effective capacity from 6.55 MW to 2.35 MW — yet the project name still references 6.55 MW.
- Total ERR discrepancy of ~10% between two monitoring reports (16,719 tCO₂e in the January 2022 report vs. 18,558 tCO₂e in the October 2021 report), with no explanation provided in the extracted record.
- Verified ERR figure is not stated in any available document, preventing independent cross-check of the claimed 16,719 tCO₂e.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test, but 64% of capacity failed add
Grid-connected wind; no reversal risk; no reversal events re
0% deduction, deemed negligible — appropriate for grid-conne
Jurisdictional baseline, grid EF 0.9528 (2012), standard for
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.