7.5 MW Wind Power project in Jodhpur, Rajasthan

CDM-3946 ↗

#1075of 1935 in Renewable energy#556of 975 in India#799of 1459 in CDM (UNFCCC)#348of 806 in AMS-I.D

5.0/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A 7.5 MW wind power project in Rajasthan validated under CDM AMS I.D with a jurisdictional baseline and VVB-confirmed investment additionality test. The project design is sound for its type, but the extracted record contains only the validation report and PDD with no monitoring or verification data, and a significant 10× discrepancy in the claimed ERR between the validation report and an appendix. The project is past its 2010–2020 crediting period, and the low extraction confidence limits the depth of assessment.

Red Flags

  • The claimed total ERR differs by a factor of 10 between the validation report (133,210 tCO2e) and an appendix (13,320.9 tCO2e), raising a data-reliability question that cannot be resolved without the original documents.
  • No monitoring or verification report was found in the extracted record, so actual delivered reductions cannot be compared against the ex-ante estimate.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some fields may be missing or misread.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified as negligible

Baseline

Jurisdictional grid EF, standard method

Safeguards

Safeguards mentioned, FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents