Skip to main content
CDMWindIndiaAMS-I.D

8.25 MW Wind Power Project in Revangaon, Maharashtra

CDM-6815 ↗

#743of 1935 in Renewable energy#369of 975 in India#510of 1459 in CDM (UNFCCC)#257of 806 in AMS-I.D

5.4/ 10
Integrity
7.0
Transparency
4.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A standard CDM wind project with a jurisdictional grid baseline and VVB-confirmed investment additionality, but a 10× discrepancy between the PDD and validation report on total emissions reductions (152,000 vs 15,200 tCO₂e) raises significant data-reliability concerns. No verified monitoring-period results are available, and the low extraction confidence across six documents limits assurance. The technology is low-risk and the baseline is standard, but the ERR contradiction and absence of verified performance data prevent a higher confidence rating.

Red Flags

  • 10× discrepancy in total ERR: the PDD (Feb 2012) states 152,000 tCO₂e while the validation report (Jul 2012) states 15,200 tCO₂e — a factor-of-ten gap that undermines confidence in the credit quantity
  • No verified monitoring-period emissions reductions found in any available document; actual performance cannot be confirmed against the claimed figure
  • Low extraction confidence across the document set, including one document of unknown type, limits the reliability of the extracted record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF, standard for CDM wind

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents