Audit Analysis
A 9.9 MW wind power project in Maharashtra registered under CDM with a solid jurisdictional baseline and VVB-confirmed investment additionality test. The first monitoring period delivered roughly 73% of the pro-rata expectation, indicating conservative crediting. However, six material findings during validation (meter accuracy, benchmark corrections, transparency gaps) and the absence of documented FPIC or grievance mechanisms temper the overall assessment.
Red Flags
- Meter serial number 04760195 was found to have accuracy class 0.5% rather than the 0.2% stated in PDD v5.2, raising questions about the precision of electricity output measurements during the first monitoring period
- No FPIC process or grievance mechanism is documented in any available record, despite safeguards being mentioned in the project documentation
- Six material findings (including benchmark value corrections in the investment analysis and incomplete local stakeholder coverage) were raised during validation, indicating the initial PDD had notable gaps
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 14,017 | 0 | 14,017 | |
| Total | 14,017 | 0 | 14,017 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Deemed negligible, reasonable for wind
Jurisdictional grid-EF baseline
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →