A-Gas ODS-VER3
#26of 110 in Water#126of 389 in United States#62of 195 in American Carbon Registry (ACR)
Audit Analysis
A-Gas ODS-VER3 is a straightforward ozone-depleting-substance destruction project in Ohio with a VVB-confirmed combined additionality test and a clear methodology (ODS/High-GWP Foam v2.0). However, four material findings—including a US EPA ECHO database violation and missing scale-calibration evidence—along with a contradiction between the PDD and validation report on leakage treatment, temper confidence in the project's procedural rigor. The verified ERR of 25,510 matches the ex-ante lifetime estimate exactly, consistent with a one-time destruction event.
Red Flags
- Four material findings in the monitoring report, including a Q1/2024 violation in the US EPA ECHO database (used-oil labeling) and missing scale-calibration evidence prior to project start, with four corresponding corrective actions still open.
- Contradiction between the PDD (leakage deemed negligible) and the validation report (leakage not addressed), leaving the leakage treatment ambiguous across the project record.
- Baseline is project-specific with no reassessment date stated in any available document.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 2,450 | 2,450 | 0 | |
| 2024 | 23,060 | 21,118 | 1,942 | |
| Total | 25,510 | 23,568 | 1,942 |
Risk Indicators
Combined test, VVB-confirmed
ODS destroyed; no reversal risk
PDD says negligible; VVB silent
Project-specific; no reassessment date
Mentioned but FPIC not conducted; grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →