Skip to main content
ACROzone Depleting SubstancesOHIO, USGeneral Methodologyv2.1

A-Gas South Korea 1

ACR-823 ↗

#18of 110 in Water#96of 389 in United States#45of 195 in American Carbon Registry (ACR)

5.8/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A-Gas South Korea 1 is an ODS destruction project under ACR with verified additionality and inherently permanent reductions (destruction is irreversible). However, the verification report raised multiple corrective and additional data requests, the monitoring window was only 16 days against a 10-year crediting period, and a crediting-period discrepancy exists between the validation report and the issuance record, collectively tempering confidence in the project's documentation and operational transparency.

Red Flags

  • The verification report (2023-05-08) lists four Additional Data Requests and one Corrective Action Request, including unconfirmed regulatory compliance for the South Korea source facility and missing evidence of ownership of environmental benefits by A-Gas.
  • The monitoring period spans only 16 days (2022-11-01 to 2022-11-16) against a 10-year crediting period, leaving the vast majority of the crediting period unmonitored in the available record.
  • The crediting period differs between the validation report (2022-11-01 to 2032-10-31) and the issuance record (2022-12-15 to 2032-12-14), and the issuance is dated 2022-11-03 — before the validation report of 2023-05-08 — raising a timeline anomaly.

Credit Vintages

IssuedRetiredAvailable
2022
88,94533,21755,728
Total88,94533,21755,728

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Irreversible ODS destruction

Leakage

Deemed negligible, appropriate for destruction

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents