Skip to main content
ACRIndustrial Process EmissionsOHIO, USGeneral Methodologyv2.1

A-Gas V2

ACR-583 ↗

#18of 345 in United States#9of 147 in American Carbon Registry (ACR)

6.5/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A-Gas V2 is a straightforward HFC refrigerant reclamation project in Ohio with VVB-confirmed additionality and a full match between claimed and verified emissions reductions (23,045 tCO₂e). The project's permanence is inherent to the avoidance mechanism, and the 0% leakage deduction is reasonable given the closed-loop reclamation process. Main weaknesses are the project-specific baseline, minimal leakage justification, and a monitoring period covering only ~8.5 months of the 10-year crediting period.

Red Flags

  • Leakage deduction of 0% is justified only as 'deemed negligible' without a quantitative analysis in the verification report
  • Monitoring period (Dec 2019 – Aug 2020) covers only ~8.5 months of the 10-year crediting period, leaving the vast majority of the crediting period unverified
  • Crediting period start date discrepancy between the issuance document (Nov 1, 2019) and the validation report (Dec 5, 2019), though the validation report's date is confirmed as the corrected value in the material findings

Credit Vintages

IssuedRetiredAvailable
2019
1,18201,182
2020
21,86321,045818
Total23,04521,0452,000

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Inherent avoidance – no reversal risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC not conducted, no grievance mechanism stated

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents