Skip to main content
ACRIndustrial Process EmissionsTEXAS; OHIO, USGeneral Methodologyv2.0

A-Gas V21

ACR-1236 ↗

#66of 115 in United States#14of 45 in American Carbon Registry (ACR)

2.8/ 10
Integrity
3.0
Transparency
2.5
Claim Safety
2.5
Documentation
3.0

Audit Analysis

The project exhibits significant evidence gaps across nearly all core quality dimensions, with critical metrics such as additionality verification, baseline methodology, and verified emission reductions entirely absent from the available records. While no material findings or corrective actions were reported, the lack of foundational data severely limits confidence in environmental integrity and claim safety. Full disclosure of verification reports and monitoring data is required before a robust assessment can be made.

Red Flags

  • Additionality test type and independent verifier confirmation not found in available documents
  • Baseline methodology, buffer pool contribution, and leakage deductions entirely missing from the record
  • Verified emission reduction figures and monitoring period boundaries unavailable for performance validation

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Buffer pool absent and reversal risk unaddressed

Leakage

Leakage deduction missing with no justification provided

Baseline

Baseline method not stated in available documents

Safeguards

No FPIC, grievance mechanism, or safeguards documentation fo

Double-claim

CORSIA and CCP eligibility status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-06General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents