A. James - 50370 Brecey
#152of 352 in Biomass#3of 7 in France#57of 111 in Puro.earth (PUR)
Audit Analysis
This Puro Alternative Materials project (biomass, France) was verified by DNV with a 10% buffer pool and no material findings, but the extracted record lacks critical information on additionality, baseline methodology, and leakage treatment. The claimed and verified removal figures match exactly at 4,261.4 tCO₂ for the 2021 monitoring period, but the absence of a lifetime ex-ante estimate prevents a meaningful pro-rata delivery check. Overall, the project shows a clean verification outcome but significant evidence gaps that limit confidence in the underlying claims.
Red Flags
- No additionality test type or VVB confirmation of additionality found in the extracted record
- Baseline methodology and last reassessment date are not stated in any available document
- Leakage deduction and justification are entirely absent from the record
- No usage rate (assumed or verified) or end-use tracking data available to validate the material substitution claim
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 4,261 | 4,261 | 0 | |
| Total | 4,261 | 4,261 | 0 |
Risk Indicators
Not stated in available documents
mixed evidence / unresolved risk
No deduction or justification found
Method not stated in record
Not documented in extracted data
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →