(ABGSPL): Methane recovery in waste water treatment & Methane/Biomass Energy Generation Project
#47of 352 in Biomass#359of 975 in India#501of 1459 in CDM (UNFCCC)#12of 115 in AMS-I.C
Audit Analysis
A CDM methane-recovery project in India with VVB-confirmed additionality and no reported reversal events, but significant transparency gaps including a missing verified ERR figure, unstated FNRB and usage-monitoring methods, and a contradiction in how leakage was justified across documents. The project-specific baseline and resolved-but-noted material findings temper an otherwise straightforward avoidance-type credit.
Red Flags
- Total ERR verified figure is absent from the extracted record, making it impossible to confirm the 29,334 tCO₂e claimed for the 2018–2020 monitoring period
- Contradiction in leakage treatment: the monitoring report (Nov 2021) states leakage was 'deemed negligible' while an undated appendix references a 'quantified' approach
- Seven material findings (CL 01, CAR 01–06) were raised during verification, indicating initial documentation and monitoring gaps, though all were resolved
- FNRB value, usage-rate assumption, and usage-monitoring method are all unstated, preventing independent assessment of the emission-factor chain
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 21,994 | 0 | 21,994 | |
| 2014 | 36,882 | 0 | 36,882 | |
| 2016 | 22,190 | 0 | 22,190 | |
| 2017 | 19,750 | 0 | 19,750 | |
| 2021 | 38,718 | 0 | 38,718 | |
| 2022 | 54,658 | 0 | 54,658 | |
| Total | 194,192 | 0 | 194,192 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification contradicted in appendix
Project-specific, reassessed 2020
Mentioned and benefit-sharing described, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →