Abu Ali Island Mangrove Planting Project Eastern Province Saudi Arabia

ICR-305 ↗

#4of 11 in Blue carbon#3of 7 in SA#72of 154 in Intl. Carbon Registry (ICR)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
3.0

Audit Analysis

A young mangrove sequestration project in Saudi Arabia with a VVB-confirmed investment test and a 10% buffer pool, but undermined by serious questions about financial additionality (the client, Saudi Aramco, is a financially stable entity), a project-specific baseline, a 0% leakage deduction with minimal justification, and an extraordinary volume of material findings and corrective actions (over 60 each) that raise significant concerns about documentation quality and data reliability. The verified ERR of 122 tCO₂e over the ~5.6-year monitoring period represents only about 0.2% of the pro-rata lifetime expectation, consistent with a project still in its early establishment phase but also reflecting the very small absolute credit volume.

Red Flags

  • Financial additionality is questionable: the VVB flagged that justification is required because Saudi Aramco is a financially stable client, undermining the investment test that underpins additionality
  • Over 60 material findings and 60+ corrective actions were identified across the validation and PDD documents, including a GPS coordinate error that initially pointed to Ukraine, an area discrepancy (965.64 ha in KMZ vs 1,210 ha in PDD), and a crediting-period inconsistency (30 vs 60 years)
  • FPIC was not conducted according to the more recent validation report (2024-12-16), and proofs of stakeholder consultation were missing from the PDD-MR
  • Leakage deduction is 0% with only a 'deemed negligible' justification, which is thin for a mangrove project where displacement of natural mangrove protection or diversion of planting efforts could constitute leakage
  • Handwritten field data records in pencil were used for sampling plot measurements, creating a risk of data loss or error

Credit Vintages

IssuedRetiredAvailable
2018
404
2019
505
2020
808
2021
24024
2022
25025
2023
37037
2024
7260726
2025
1,10501,105
2026
1,53301,533
2027
1,59901,599
2028
2,34602,346
2029
4,50504,505
2030
5,44105,441
2031
6,70606,706
2032
7,08207,082
2033
8,52708,527
2034
9,42109,421
2035
9,43009,430
2036
10,278010,278
2037
9,59209,592
2038
10,278010,278
2039
8,95808,958
2040
8,29808,298
2041
7,63807,638
2042
6,06406,064
2043
6,31806,318
2044
5,65805,658
2045
5,65805,658
2046
4,99804,998
2047
3,63803,638
Total145,9000145,900

Risk Indicators

Additionality

VVB-confirmed investment test, but financial additionality questioned given Saudi Aramco's stability

Permanence

10% buffer pool in place, no reversal events reported

Leakage

0% deduction with only 'deemed negligible' justification

Baseline

Project-specific baseline, no reassessment date stated

Safeguards

Grievance mechanism present, but FPIC not conducted and consultation proofs missing

Double-claim

CORSIA explicitly excluded, but CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VM0033; AR AM0014

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents