Advanced Refrigeration - ARS2021005
#48of 110 in Water#181of 389 in United States#92of 195 in American Carbon Registry (ACR)
Audit Analysis
A multi-state US advanced refrigeration project (HFC replacement) with VVB-confirmed additionality and a consistent ERR figure of 166,106 tCO2e across all documents. However, six material findings—including inconsistent baseline cooling capacities, GPS errors, and monitoring-report inaccuracies—along with six outstanding corrective actions significantly undermine confidence in the baseline and MRV data. The project is operational and the technology is sound, but documentation quality and baseline reliability remain concerns.
Red Flags
- Six material findings in the verification report, including inconsistent cooling capacities in baseline calculations for Publix #1706 and #1789, which directly affect the ERR for those stores
- Six corrective actions remain outstanding, including unresolved store-opening-date evidence, ESIA errors, and incorrect GPS coordinates in the Project Plan
- Leakage justification is contradictory: the monitoring report (Dec 2023) states it was deemed negligible, while the validation report (Dec 2023) records it as not addressed
- Baseline is project-specific with no reassessment date stated in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 51,973 | 51,973 | 0 | |
| 2022 | 114,133 | 107,278 | 6,855 | |
| Total | 166,106 | 159,251 | 6,855 |
Risk Indicators
Combined test, VVB-confirmed
Fixed refrigerant charge, no reversal risk
Deemed negligible but contradictory across docs
Project-specific, no reassessment date, material findings on capacities
Mentioned but FPIC not conducted, grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →