Skip to main content
ACRIndustrial Process EmissionsFLORIDA; CALIFORNIA; NEW JERSEY; NEW YORK; MINNESOTA, USGeneral Methodologyv2.1

Advanced Refrigeration - ARS2022002

ACR-876 ↗

#68of 110 in Water#227of 389 in United States#122of 195 in American Carbon Registry (ACR)

4.8/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A US multi-state advanced refrigeration project replacing high-GWP HFCs with low-GWP alternatives, validated by Ruby Canyon Environmental. The project type offers strong inherent permanence (reductions are fixed once refrigerant is replaced) and VVB-confirmed additionality, but the validation report surfaced 20 material findings and 10 corrective actions related to data inconsistencies, missing invoices, and unclear GWP calculations, significantly undermining confidence in the underlying quantification.

Red Flags

  • The validation report (2023-09-01) lists 20 material findings including inconsistencies in refrigerant charge sizes, unclear GWP determination methods for R-404A and R-407A blends, and discrepancies in leak-rate data across multiple facilities (DeCicco, Bel Air, Nicholas Market, Lunds/Byerlys, ShopRite Elmsford).
  • Ten corrective actions were required, including missing invoices for new CO2 systems, absent full-charge documentation for two sites, and a lack of EPA compliance attestation for displaced HFC management.
  • Leakage is set at 0% with only a 'deemed negligible' justification and no quantified analysis, despite the project involving physical displacement of HFC refrigerants across multiple commercial sites.
  • The baseline is project-specific rather than jurisdictional or standardised, and no baseline reassessment date is recorded in the available documents.

Credit Vintages

IssuedRetiredAvailable
2022
51,63251,6320
2023
12,50311,833670
Total64,13563,465670

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Fixed once refrigerant replaced; no reversal risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned; FPIC not conducted, no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents