Advanced Refrigeration - ARS2023008
#48of 108 in Water#157of 345 in United States#67of 147 in American Carbon Registry (ACR)
Audit Analysis
A multi-state US refrigeration retrofit project verified by Tuv Sud with a confirmed combined additionality test, but the first monitoring report surfaced seven material findings (corrective action requests) involving calculation errors, a missing facility, and scope inconsistencies. The verified emission reductions (55,756) exceed the original ex-ante lifetime estimate (55,715), raising over-crediting concerns that appear linked to a mid-period project expansion (Kansas facility) that was not reflected in the baseline documentation.
Red Flags
- Verified ERR of 55,756 exceeds the ex-ante lifetime claim of 55,715, indicating the project delivered more than its original lifetime estimate in a single ~11-month monitoring period — a strong signal of scope expansion or calculation error
- Seven material findings (CARs) in the monitoring report, including a doubled refrigerant charge size, a missing Kansas facility, and a baseline cooling-capacity error at Dodge City, all pointing to significant data-quality weaknesses in the first reporting cycle
- Crediting-period start date is inconsistent between the monitoring report (2024-01-08) and another document (2024-09-05), creating ambiguity about the true project start and the applicable baseline period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 55,715 | 0 | 55,715 | |
| Total | 55,715 | 0 | 55,715 |
Risk Indicators
Combined test confirmed by Tuv Sud
Industrial retrofit; no carbon-stock reversal risk
Deemed negligible; reasonable for refrigerant replacement
Project-specific; not yet due for reassessment
Safeguards mentioned; FPIC not conducted; grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →