Skip to main content
ACRIndustrial Process EmissionsFLORIDA; KANSAS; GEORGIA; ALABAMA; SOUTH CAROLINA, USGeneral Methodologyv2.1

Advanced Refrigeration - ARS2023008

ACR-1130 ↗

#48of 108 in Water#157of 345 in United States#67of 147 in American Carbon Registry (ACR)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A multi-state US refrigeration retrofit project verified by Tuv Sud with a confirmed combined additionality test, but the first monitoring report surfaced seven material findings (corrective action requests) involving calculation errors, a missing facility, and scope inconsistencies. The verified emission reductions (55,756) exceed the original ex-ante lifetime estimate (55,715), raising over-crediting concerns that appear linked to a mid-period project expansion (Kansas facility) that was not reflected in the baseline documentation.

Red Flags

  • Verified ERR of 55,756 exceeds the ex-ante lifetime claim of 55,715, indicating the project delivered more than its original lifetime estimate in a single ~11-month monitoring period — a strong signal of scope expansion or calculation error
  • Seven material findings (CARs) in the monitoring report, including a doubled refrigerant charge size, a missing Kansas facility, and a baseline cooling-capacity error at Dodge City, all pointing to significant data-quality weaknesses in the first reporting cycle
  • Crediting-period start date is inconsistent between the monitoring report (2024-01-08) and another document (2024-09-05), creating ambiguity about the true project start and the applicable baseline period

Credit Vintages

IssuedRetiredAvailable
2024
55,715055,715
Total55,715055,715

Risk Indicators

Additionality

Combined test confirmed by Tuv Sud

Permanence

Industrial retrofit; no carbon-stock reversal risk

Leakage

Deemed negligible; reasonable for refrigerant replacement

Baseline

Project-specific; not yet due for reassessment

Safeguards

Safeguards mentioned; FPIC not conducted; grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents