Skip to main content
ACRIndustrial Process EmissionsGEORGIA; TEXAS; MASSACHUSETTS; ARIZONA, USGeneral Methodologyv2.1

Advanced Refrigeration - ARS2023009

ACR-1133 ↗

#65of 110 in Water#213of 389 in United States#114of 195 in American Carbon Registry (ACR)

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A US-based advanced refrigeration project with VVB-confirmed additionality (combined test) and a 10-year crediting period, but undermined by five material findings (including a technical inconsistency in cooling-capacity calculations), a leakage treatment that is contradicted between the monitoring and validation reports, and identical claimed/verified/lifetime ERR figures that raise over-crediting questions. Multiple verification parameters (FNRB, usage monitoring, CORSIA status) are absent from the record.

Red Flags

  • Verified ERR (77,286) equals the full lifetime ex-ante estimate for a monitoring period of only ~5 months out of a 120-month crediting period, implying ~25× the pro-rata expectation; while a one-time refrigerant-charge methodology could explain this, the identical figures across all three ERR fields warrant independent recalculation.
  • The validation report (Sept 2025) does not address leakage, while the monitoring report (Aug 2025) states it is 'deemed negligible' — an unresolved contradiction in a sector where refrigerant leakage is a material risk.
  • Five material findings were reported, including inconsistent cooling capacities in calculations versus as-built refrigeration schedules for two locations, indicating the ERR calculation may not reflect actual installed capacity.

Credit Vintages

IssuedRetiredAvailable
2023
77,28620,87556,411
Total77,28620,87556,411

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

Technology-based; no carbon-stock reversal risk

Leakage

Deemed negligible but contradicted across reports

Baseline

Project-specific; no reassessment date recorded

Safeguards

Mentioned but FPIC not conducted; grievance mechanism not stated

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents