Advanced Refrigeration - ARS2023010
#89of 110 in Water#296of 389 in United States#157of 195 in American Carbon Registry (ACR)
Audit Analysis
This ACR refrigeration project has a VVB-verified additionality assessment and a reputable verifier (TÜV SÜD America), but the monitoring report reveals 12 material findings—including a double-counting error, incorrect baseline refrigerants, and GWP misassignments—that required 8 corrective actions. Most critically, the verified emissions reduction of 121,725 tCO₂e in a 9-month monitoring period represents roughly 13.6× the pro-rata expectation derived from the 122,026 tCO₂e lifetime ex-ante estimate, raising a severe over-crediting concern that cannot be dismissed without further clarification.
Red Flags
- Verified ERR of 121,725 tCO₂e in a 9-month monitoring period equals 99.8% of the 122,026 tCO₂e lifetime ex-ante estimate, implying a 13.6× over-delivery relative to the pro-rata expectation of ~8,920 tCO₂e for the elapsed period
- Twelve material findings in the monitoring report, including a double-counting error between Store 634 and Store 694, incorrect baseline refrigerant identifications, and GWP misassignments, required eight corrective actions before the report could be accepted
- Leakage is deemed negligible with no quantified deduction or detailed justification in the available documents
- Crediting period dates are inconsistent between the monitoring report (2024-01-03 to 2034-01-02) and another document (2023-09-05 to 2033-09-04)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 122,026 | 0 | 122,026 | |
| Total | 122,026 | 0 | 122,026 |
Risk Indicators
VVB-confirmed combined test
Technology-based, no reversal risk
Deemed negligible, no quantified deduction
Project-specific, errors found in monitoring
Mentioned but FPIC and grievance absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →