Skip to main content
ACRIndustrial Process EmissionsGEORGIA; OKLAHOMA, USGeneral Methodologyv2.1

Advanced Refrigeration - ARS2023013

ACR-1187 ↗

#198of 345 in United States#92of 147 in American Carbon Registry (ACR)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
4.0
Documentation
5.5

Audit Analysis

This ACR refrigeration project in the US has a VVB-confirmed additionality assessment and a reputable verifier (Tuv Sud), but the monitoring report surfaced six material findings involving baseline calculation errors, a missing facility, and address discrepancies that required corrective actions including the removal of one store from the project. The verified ERR of 47,249 tCO₂e equals the full lifetime ex-ante estimate despite covering only ~9.5 months of a 120-month crediting period, raising a significant over-crediting concern. Key technical parameters such as the F-gas emission factor and usage monitoring method are absent from the extracted record.

Red Flags

  • Verified ERR of 47,249 tCO₂e equals the full 10-year lifetime ex-ante estimate, yet the monitoring period covers only ~9.5 months of the 120-month crediting period — a pro-rata ratio of roughly 1,265% of the expected delivery for the elapsed period
  • Six material findings in the monitoring report include baseline charge calculation errors (Publix #1155, #2039), a missing facility (Dacula, GA), and incorrect store addresses, with corrective actions requiring the removal of Publix #2039 from the project and ER calculations
  • Crediting period contradiction: the monitoring report (2026-07-15) states 2024-09-10 to 2034-09-09, while an earlier document (2025-06-27) states 2023-10-03 to 2033-10-02, suggesting a possible project restart or documentation inconsistency
  • F-gas emission factor (FNRB) method and value are not stated in any available document, which is a critical parameter for refrigerant-based emissions calculations

Credit Vintages

IssuedRetiredAvailable
2024
30,429030,429
2025
16,820016,820
Total47,249047,249

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Technology-based, no reversal risk

Leakage

Deemed negligible, unquantified

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned, FPIC not conducted, no grievance mechanism stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents